MR5000LCeiling Monitor Mountfor the MR5000 SeriesPublic Viewing SystemInstallation/Operation ManualC221M-C (6/03)®Pelco World Headquarters • 3500 Pelc
2 Pelco Manual C221M-C (6/03)This symbol indicates that dangerousvoltage constituting a risk of electric shockis present within this unit.This symbol
Pelco Manual C221M-C (6/03) 3IMPORTANTRefer to the following chart for recommended mounts, installation surfaces, and minimalhardware requirements.Mou
4 Pelco Manual C221M-C (6/03)INSTALLATIONThe following parts are supplied:1 Mount arm1 Rack base2 Rack sides11 1/2-inch NPT pipe6 #8 x .50-inch, Phill
Pelco Manual C221M-C (6/03) 5Install Mount Arma. Install the MRWA wall mount (not supplied) or MRCA ceiling mount (not supplied). Forinstallation sur
6 Pelco Manual C221M-C (6/03)Install MR5000 Series AccessoriesPCM5000 Light-Duty Camera Mount Assemblya. The PCM5000 camera mount assembly can be ins
Pelco Manual C221M-C (6/03) 7 Prepare Monitor for InstallationRefer to Figure 6 and remove themonitor’s back feet and side screws.SECURE BOTHSIDES OF
8 Pelco Manual C221M-C (6/03)Connect Video and Power to Monitora. Connect the video cable to the BNC video input on the rear panel of the monitor.b.
Kommentare zu diesen Handbüchern